CAD $3,800,000
2012-2014
This newly installed system consists of a domestic water filtration system that is automated and controlled by a monitoring PLC program. It also houses a fire and water storage facility with a 2-hour storage capacity. Both systems distribute water to the 200 man camp through a common distribution pipe.