KEEYASK WATER TREATMENT PLANT - NME Construction Services Ltd.
420
page-template,page-template-full_width,page-template-full_width-php,page,page-id-420,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-4.12,vc_responsive

Project Cost:

CAD $4,066,000

Year:

2012

Project Description:

This project was completed for Manitoba Hydro under the Keeyask Infrastructure Project. The first phase of this project included the following: The supply of all design and engineering of water storage facilities and a potable water treatment plant for a 200 man startup construction camp near Gillam, MB. This design-build system consisted of a new domestic water filtration system that is automated and controlled by a monitoring PLC program.

It also houses a fire water storage pre-engineered building facility with a 2-hour storage capacity. Both systems distribute water to the 200 man camp through a common distribution pipe. The manufacture, construction, testing and commissioning of a potable water treatment plant (“WTP”) at the start up camp for the Keeyask Infrastructure Project. The second phase of this project includes the onsite installation of the above water treatment facilities.

Newton Mechanical Electrical INC. offers the best products and service in the industry. Contact Us Today! Ph: (204) 415-1052