NORTH END WATER POLLUTION CONTROL CENTRE - NME Construction Services Ltd.
422
page-template,page-template-full_width,page-template-full_width-php,page,page-id-422,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-4.12,vc_responsive

Project Cost:

CAD $1,290,990

Year:

2010

Project Description:

The work to be prepared includes various piping within two new buildings (Hauled Wastewater and Leachate) and within the existing plant. Our scope of work included the placement of various pumps, boilers, sampling equipment, snowmelt systems, and the replacement of existing sludge pumps. The work also included with sheet metal ductwork, heat recovery ventilators insulation and a Building Management Systems, (BMS).

Newton Mechanical Electrical INC. offers the best products and service in the industry. Contact Us Today! Ph: (204) 415-1052