page-template,page-template-full_width,page-template-full_width-php,page,page-id-425,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-4.12,vc_responsive

Project Cost:

CAD $4,700,000

Year:

2007-2008

Project Description:

Newton Mechanical was involved in 3 major mechanical projects in Wuskwatim, the new water treatment plant, the Pre Engineering Buildings and the new 600 man camp. Although there were three different general contractors, all projects eventually tied together into one working system. We were responsible for the construction of the water treatment plant from the top slab up, as well as all the mechanical works for the new 600 man camp and Pre Engineering building.

The crucial part of this project was finishing the deadline to ensure all parts would be operational when the water treatment plant was ready to go online. With ongoing new construction, Newton Mechanical Electrical INC. also took on the role for Manitoba Hydro of all ongoing preventative maintenance for the plumbing and piping systems. Manitoba Hydro also enlisted Newton Mechanical to install their temporary pump house and water treatment plant. With having Newton Mechanical involved in all mechanical works the schedule was easily maintained to bring a multi-functioning and complete mechanical system online.

Newton Mechanical Electrical INC. offers the best products and service in the industry. Contact Us Today! Ph: (204) 415-1052